Group: 1309
Quick-installation element for efficiently mounting pipe clamps and other components to all Sikla Channels of the 41 series (double channels also).
Blockset completely pre-assembled.
Insert the Blockset into the channel; tighten nut - the job is done!
Dismounting takes place in reverse order by turning the to the left and exerting light pressure on the grooved rod in channel direction.
| Type | M [Nm] | FZ [kN] |
|---|---|---|
| M8 x ... | 10 | 3.3 |
| M10 x ... | 18 | 4.5 |
FZ = permissible traction at the grooved rod
> The point carrying capacity of the channel must not be exceeded.
| Material: | Steel, electro-galvanised |
| Type | L [mm] |
W [kg] |
Quantity [pack] |
Part- No. |
|---|---|---|---|---|
| M8 x 35 | 35 | 0.07 | 25 | 191549 |
| M8 x 75 | 75 | 0.08 | 25 | 191558 |
| M8 x 125 | 125 | 0.10 | 25 | 191567 |
| M8 x 175 | 175 | 0.11 | 25 | 191576 |
| M8 x 275 | 275 | 0.14 | 25 | 191585 |
| M10 x 35 | 35 | 0.09 | 25 | 191594 |
| M10 x 75 | 75 | 0.10 | 25 | 191603 |
| M10 x 125 | 125 | 0.12 | 25 | 191612 |
| M10 x 175 | 175 | 0.15 | 25 | 191621 |
| M10 x 275 | 275 | 0.20 | 25 | 191639 |